Independent FatBook v3 cost indexVerified permit/source data where availableReviewed by Leonard "Chuck" Thompson
2026-08-19 Calculator Baseline
Start with the 2026-08-19 national plumbing benchmark of $1,832, then choose your metro and service to compare a contractor quote against local range, lowest realistic price, and margin data.
Updated Aug 2026. Sources: BLS OEWS, FRED PPI, Craftsman labor-hour references, city permit data where available, and FatBook v3 cost-index methodology.
Every plumbing number here starts as parts: Craftsman labor hours priced at BLS wages for your metro, materials tracked against producer prices, permit data where cities publish it, and real contractor overhead. Cost index version: 2026-08-19. Updated Aug 2026.
Set the project size so the bid is judged against the right cost to deliver.
$
Type the number off the estimate, or drag the bar. The gauge below shows where it lands.
Or
Upload contractor estimate
Drag and drop or click here. PDF or CSV, we extract the line items.
Or paste it
Analyzed estimates are stored anonymized (names, addresses, phone numbers, and emails stripped) to improve the benchmark. No account, no tracking.
Extracting your estimate details…
Extracted Line Items
Scope Check
National Average
Within the fair range.
Fair range
Fair range$1,734 to $2,003
Cost to deliver$1,510
Typical market bid$1,832
Your bid$1,832
Implied margin18%
Fair range. Cost to deliver is the break-even, the red line on the gauge, not the price to demand. A fair bid sits in the green band above it: most jobs land at a 15 to 22 percent margin on the bid, roughly 18 to 28 percent over the cost to deliver, leaner or richer by trade and market. Contractors earn that, and they should: nobody works for free, and if the job were easy you would not need one.
Technical BlueprintLIVE SCHEMA
True Cost Benchmark
$1,832
Typical range: $1,734 to $2,003 · Lowest realistic price: $1,734
It prices the job from the ground up: Craftsman labor hours times the BLS wage for your metro, plus PPI-adjusted materials, the verified permit fee where we have it, and a per-trade overhead benchmark. That gives a cost to deliver, and the fair range sits above it. Pick your city and service and it sizes the number to your market.
Is it free, and do I have to enter my contact information?
Free, and no. You get the number with no signup: the calculator runs in your browser on published cost data, so nobody asks for your email or phone to see the answer.
How accurate are the estimates?
They are modeled from federal wage data, a licensed cost book, current material price indices, and real city permit fees, not survey self-reports or scraped quotes. Treat the result as a fair market benchmark to check a bid against, not a binding quote. Your home's specifics and a contractor's scope still move the final number.
Can I check a contractor's bid with it?
Yes. Paste the quote into the bid checker and it grades the number against the local range, the lowest realistic price, and the typical contractor margin. A 15 to 22 percent margin on the bid is normal and earned, roughly 18 to 28 percent over the cost to deliver, with a fair ceiling higher on complex trades, so the checker flags a bid that runs well past that and gives you something concrete to negotiate with before you sign.
DO
Cost index built by David Olson, Creator of the Cost Index & Permit Dataset · Methodology reviewed by Leonard "Chuck" Thompson, LC Thompson Construction Co., Owner (retired) · 2026-08-19